Rates Effective January 1, 2016 For All BPU Service Territory. Charges will change January 1, 2018. Click HERE to view 2018 water service charges.

 

BASE CHARGE: Based on size of meter.

Meter SizeBase ChargeOutside
City Limits
5/8″$10.40$15.60
1″$21.00$31.50
1 1/2″$44.50$66.75
2″$78.60$117.90
3″$183.40$275.10
4″$324.80$487.20
6″$654.90$982.35
8″$943.10$1,414.65

 

USAGE CHARGE

Usage BlockUnit Charge –
Inside City Limits
Unit Charge –
Outside City Limits
RESIDENTIAL
0-20 units$2.15/unit$3.23/unit
21-40 units$2.58/unit$3.87/unit
41-60 units$3.10/unit$4.65/unit
Over 60 units$3.72/unit$5.58/unit
COMMERCIAL
All Units$2.13/unit$3.48/unit
WHOLESALE
All Units$3.48/ unit

1 UNIT = 1,000 gallons

 

CONNECTION CHARGE: Effective October 1, 2012

Meter SizeInside
City Limits
Outside
City Limits
5/8″$600.00$900.00
1″$675.00$1012.50
1 1/2″$1050.00 plus bore$1575.00 plus bore
2″$1200.00 plus bore$1800.00 plus bore
Larger than 2″Actual CostsCost x 1 1/2

Connection charges must be paid in full before service is turned on.

 

GENERAL NOTE:

In the event the customer orders a disconnection and re-connection of water at the same premise within a period of twelve (12) months, the BPU may collect as a re-connection charge the sum of such minimum bills as would have accrued during the period of disconnection.

Wherever water service is required outside the city limits, the customer shall construct his water line to the nearest water main. The rate schedule for this service shall be the “Out side City Limits” charge.

In the interest of water conservation, indiscriminate waste of water by the customer will be grounds for temporary discontinuation of water service by the utility. It will be the customer’s responsibility to demonstrate corrective measures that will stop excessive waste of water resources.

NOTE:

Rate Effective: October 1st, 2014 Water Rate Schedule
WAT-14 replaced Water Rate Schedule: April 2nd, 2007.